In 2026, modern work rarely leaves long, quiet study blocks. The Cisco DevNet Associate formats on Prep4away solve that time problem by fitting practice into whatever device and location the day offers.
Cisco 200-901 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Infrastructure and Automation | 20% | - Automation scripting
|
| Software Development and Design | 15% | - Describe software development methodologies
|
| Network Fundamentals | 10% | - Networking concepts
|
| Understanding and Using APIs | 20% | - REST-based APIs
|
| Application Deployment and Security | 20% | - Security concepts
|
| Cisco Platforms and Development | 15% | - Cisco automation platforms
|
What 200-901 Candidates Want to Know
The Cisco DevNet Associate questions are written and organized by senior experts and experienced specialists so that your study time concentrates on the most test-relevant knowledge. Instead of spreading your effort across endless coverage, you practice what the 200-901 exam actually weighs, which raises your learning efficiency session by session.
The real 200-901 exam gives you 120 minutes minutes for 90-110 questions. Rehearsing under the same conditions on the Prep4away engine builds the pacing you will rely on.
- Application Deployment and Security (20%)
- Understanding and Using APIs (20%)
- Software Development and Design (15%)
Let the weights decide where your hours go first.
Three versions cover different working lives. The PDF downloads for learning at any time. The PC test engine runs on unlimited computers, so you can study on screens at home and at the workplace. The online engine works on any electronic equipment, with no device limit and offline use supported, so practice never depends on your location.
The package contains 484 practice questions for the 200-901 exam, all verified by senior experts and organized for focused, efficient revision.
To pass 200-901 you need Pass/Fail, and the official exam fee is $300 USD. Fixing both figures early keeps your target concrete and your budget planned.
No formal prerequisites. Basic Python programming and networking knowledge are recommended.
Cisco DevNet Associate Sample Questions:
Refer to the exhibit.
A network engineer makes a RESTCONF API call to Cisco IOS XE to retrieve information. Which HTTP method and URL does the engineer use to make the ..call?
- A.

- B.

- C.

- D.

Correct Answer: A 🗳️
Explanation: Only visible for Prep4away members. You can sign-up / login (it's free).
Refer to the exhibit.
A developer must integrate a bot with an internal communication app. The developer wants to replace the webexbot package with the teamsbot package by using Ansible and prepares a playbook In the first two tasks, the playbook stops the webexbot and verifies that the teamsbot is installed. What is accomplished in the last task of the workflow when the developer runs the Ansible playbook?
- A. stops the webexbot service and uninstals it and retains its configuration files
- B. uninstalls the webexbot package and removes its configuration files
- C. searches whether the purge package is available in the repository and uninstalls the webexbot package
- D. installs the webexbot and retains the configuration files
Correct Answer: B 🗳️
Explanation: Only visible for Prep4away members. You can sign-up / login (it's free).
Drag and drop the characteristics from the left onto the software development methodologies on the right.
Correct Answer:

Reference:
Cisco DevNet Associate Certification Guide, Sections on Agile and Lean methodologies Official documentation and resources on Agile and Lean software development practices
"The Lean Startup" by Eric Ries (for Lean principles)
"Agile Software Development with Scrum" by Ken Schwaber and Mike Beedle (for Agile principles) Therefore, the correct mapping is:
Agile:
Optimization of the development process
Focused on the processes of a specific team
Lean:
Optimization of the production process
Focused on the processes of an organization
What is a principle of a code review process?
- A. Changes are made after the code is submitted to source control.
- B. A technical lead must sign off on the review.
- C. It must not prevent code from getting into production as quickly as possible.
- D. Naming standards must be consistent.
Correct Answer: D 🗳️
Explanation: Only visible for Prep4away members. You can sign-up / login (it's free).
Refer to the exhibit.
A security team observes an attack that originates from a Cisco Meraki device. To mitigate the attack, the team requests that the engineering team remove the /ice from the network. The security team also requests information about the device, such as Its name and location. Which tool must the engineering team use to meet the luirements by using tasks?
- A. Ansible
- B. Postman
- C. cURL
- D. CFEngine
Correct Answer: A 🗳️
Explanation: Only visible for Prep4away members. You can sign-up / login (it's free).
Viewing page 1 out of 97 pages.
Viewing questions 1-5 out of 484 questions.