Nobody buys study materials to find typos in them. Prep4away treats error prevention as a system, not a hope: a strict quality process stands behind the CIMA Risk Management bank, so 223 practice questions read the way professionals would write them.
CIMA CIMAPRA19-P03-1 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Enterprise Risk | 25% | - Risk Identification
|
| Internal Controls | 25% | - Control Systems
|
| Strategic Risk | 25% | - Strategic Decision Risk
|
| Cyber Risk | 25% | - Cyber Threats
|
CIMAPRA19-P03-1 Exam FAQ: Review, Demo, and Policy
Completion of CIMA Operational Level (or equivalent exemptions where applicable) Since requirements change over time, confirm the latest on the official CIMA exam page before scheduling.
The CIMAPRA19-P03-1 exam is a CIMA certification exam validating the CIMA Risk Management syllabus shown above. It belongs to these credential paths: CIMA Certificate in Business Accounting, CIMA Operational Level, CIMA Management Level, CIMA Strategic Level. Candidates in 2026 prepare for it with Prep4away's 223 practice questions, available as a printable PDF, a Windows Desktop Test Engine, and an Online Test Engine — three versions of the same materials.
CIMA recommends these training resources for the CIMA Risk Management exam:
Follow the training with steady self-testing — the 223 practice questions from Prep4away help you apply theory and fill any gaps the training leaves.
The CIMA Risk Management exam requires 100/150 (scaled score, approx. 67%) to pass, and registration costs Approximately £95–£120 (varies by region and tax). A failed attempt means paying the same fee again — a readiness check with the Prep4away engines before booking is the cheaper option.
The CIMA Risk Management exam contains 60 to complete within 90 minutes. Timed simulation in the Prep4away Desktop Test Engine teaches that rhythm before exam day does.
Prep4away issues a full refund if you take the CIMA Risk Management exam within 60 days of purchase and do not pass. The policy does not apply if the exam is taken within 3 days of purchase, if the exam was never actually taken, or to free materials or expired orders, and the candidate name must match the payer name. Submit a scan of your enrollment slip and the official Score Report PDF within 2 days of the exam; claims are processed within 7 days. Alternatively, exchange for two free exam products of equal value and keep your original update service. Orders arrive by email within 1 minute — contact support if nothing arrives within 2 hours.
Three versions of the same study materials: a printable, expert-prepared PDF with free demo download and instant access; a Desktop Test Engine for Windows with customizable simulation and timed modes that works offline; and an Online Test Engine for any browser on Windows, Mac, Android, and iOS with test history and performance review. All 223 practice questions are identical across versions. Every purchase includes 365 days of free updates, a 50% renewal discount afterward, and unlimited computer installations.
The official CIMA Risk Management outline defines 4 domains. The leading three are Cyber Risk (25%), Internal Controls (25%), and Strategic Risk (25%). The full list is in the topics section above, and Prep4away's 223 practice questions cover each one.
Computer-based exam (Pearson VUE test centres or online proctored exam) Register for the CIMA Risk Management exam through these official channels:
After booking, Prep4away delivers your practice questions within 1 minute — preparation starts the same day.
CIMA Risk Management Sample Questions:
Which risks should be given the highest priority?
- A. Risks which have a low impact but which arise frequently.
- B. Risks which have a high impact and which may arise occasionally.
- C. Risks which have a high impact and have a low likelihood of arising.
- D. Risks which have a low impact and a low likelihood of arising.
Correct Answer: B 🗳️
B is a horticultural retailer with limited funds available to acquire new retail property.
B's Finance Manager has analysed two potential property investments. Investing in property P shows an IRR of 21% while the IRR on property Q is 17%.
The Finance Manager has also advised that the NPV for property P is $750K, while the NPV of property Q is $850K.
The Board needs to choose between the two properties as it has insufficient funds for both. Based purely on the Finance Manager's analysis, which of the following is true?
- A. Board members who wish to maximise return on capital employed will want property Q while those who wish to maximise shareholder wealth will want property P.
- B. Premises Q is clearly better than property P in all respects.
- C. Board members who wish to maximise return on capital employed will want property P while those who wish to maximise shareholder wealth will want property Q.
- D. Premises P is clearly better than property Q in all respects.
Correct Answer: C 🗳️
The long-term prospects for inflation in the UK and the USA are 2% and 6% per annum respectively.
The GBP/USD spot rate is currently GBP/USD1.71.
Using purchasing power parity theory, what GBP/USD spot rate would you expect to see in three months' time?
- A. GBP/USD1.77
- B. GBP/USD1.73
- C. GBP/USD1.69
- D. GBP/USD1.65
Correct Answer: B 🗳️
Which of the following statements are correct?
- A. It is always possible to remove all risks when undertaking large projects.
- B. If a project has low risks it will usually have relatively low returns.
- C. Risk can always be transferred to someone else.
- D. If a project has high risks it should always be accepted as the rewards will always be high.
- E. Risk should be carefully considered when evaluating possible future projects.
Correct Answer: B,E 🗳️
M built a large factory last year and it has just been completed. The initial outflows on this project have a present value of $400 million and the entire project has a net present value of $30 million.
The initial phase of the project caused problems and there was an overspend of $35 million as there was unstable soil. The foundations had to be underpinned with large steel bars to ensure the building would be safe. There was no other suitable site for the project.
The construction could not be abandoned as the site would have had very little commercial value.
The Internal Audit department has been asked to carry out a post completion audit. What issues should it concentrate on?
- A. The audit should consider the initial survey report when the land was purchased to see if the survey mentioned the unstable soil.
- B. The audit should find out who was to blame for the project being over budget.
- C. The audit should look at documentation to ensure proper procedures were followed at all stages of the project.
- D. The audit should consider whether it should have built the factory without underpinning and sold it on quickly.
- E. The audit should consider what lessons could be learned for future projects.
Correct Answer: A,C,E 🗳️
Viewing page 1 out of 45 pages.
Viewing questions 1-5 out of 223 questions.


